航 行 通 告
冀航通〔2024〕0072号
秦皇岛市黄金海岸侵蚀岸线生态修复工程
一、施工时间
2024年3月31日至2024年4月24日,每日24小时。
二、施工区域
生态修复施工海域:
39°44'20.076"N/119°21'30.996"E
39°43'53.760"N/119°21'28.188"E
39°41'35.412"N/119°20'25.044"E
39°41'14.172N/119°19'56.064"E
航线1:
39°12′N/118°58.78′E
39°12.47′N/118°59.94′E
39°9.21′N/119°4.08′E
39°9.04′N/119°4.93′E
39°3.86′N/119°11.85′E
39°9.49′N/119°23.44′E
39°11.6′N/119°26.88′E
39°15.71′N/119°30.32′E
39°21.93′N/119°35.8′E
39°40.56′N/119°38.67′E
39°46.91′N/119°28.74′E
39°41.45′N/119°20.76′E
航线2
39°25.94′N/119°19.32′E
39°23.27′N/119°33.7′E
39°40.43′N/119°39.33′E
39°46.97′N/119°28.95′E
39°41.55′N 119°20.81′E
滦河口取沙地:
39°26'12.012"N/119°17'11.256"E,
39°26'12.012"N/119°17'1.032"E,
39°25'54.624N/119°17'26.916"E,
39°25'57.684"N/119°17'26.916"E,
39°25'45.732"N/119°18'19.548"E,
39°26'3.048"N/119°18'18.360"E;
39°26'13.956"N/119°18'18.216"E;
39°26'38.724"N/119°18'10.008"E;
39°26'39.948"N/119°18'7.956"E;
39°26'50.352"N/119°18'5.076"E;
39°26'29.292"N/119°17'39.516"E;
39°26'25.296"N/119°17'36.060"E
京唐港取沙地:
39°11.972"N,118°58.764′E范围内区域
三、施工船舶海之韵68、舟舸7、万顺588。
四、施工单位
河北宝地建设工程有限公司。
五、注意事项
1、施工船白天垂直悬挂球、菱形、球号型,夜间垂直显示红、白、红三盏环照灯。
2、作业船和警戒船保持守听VHF08频道,与过往船舶联络。
3、施工区域即为安全作业区,请过往船舶谨慎驾驶,其他无关船舶避免进入本项目安全作业区水域。
2024年3月30日